Multi-Family

The Edge at Olathe with Straub Construction

  • 22 unit apartment complex in Olathe, KS
  • Units with 2 bedroom, 1 bathroom, and a kitchen
  • Rebuild of previously burned down building
  • Saw cut and replacement of existing underground
  • Materials were PVC for drain, waste, and vent
  • PEX & Polymer fittings for unit distribution
  • CPVC fittings for water mains
  • Installed fire service line & FDC line (ductile iron)
  • Installed a new water meter & water service to the building (type K copper pipe and fittings)

This slideshow requires JavaScript.

 

Pendleton Flats with 4Sight Construction

  • 30-unit apartment complex across three buildings in Kansas City, MO
  • Remodel of existing buildings
  • Saw cut & excavated to install new trunk lines for the sanitary system & water service
  • Installed a pump in each building
  • Materials were PEX for water piping above grade
  • Materials were uponor PEX for water piping below grade
  • Materials were PVC for below grade drain, waste, and vent
  • Cast iron for condensate piping (no hub cast iron pipe and fittings)
  • Installed new area drains for the patios
  • New inline traps to serve the area drains

This slideshow requires JavaScript.

 

Maple Terrace with 4Sight Construction

  • 72 units of student housing near KCUMB
  • Materials used were CPVC water mains, PEX unit distribution, and PVC for sanitary

 

Brittany Court Clubhouse with 4Sight Construction

  • New construction in Gardner, KS