The Edge at Olathe with Straub Construction
- 22 unit apartment complex in Olathe, KS
- Units with 2 bedroom, 1 bathroom, and a kitchen
- Rebuild of previously burned down building
- Saw cut and replacement of existing underground
- Materials were PVC for drain, waste, and vent
- PEX & Polymer fittings for unit distribution
- CPVC fittings for water mains
- Installed fire service line & FDC line (ductile iron)
- Installed a new water meter & water service to the building (type K copper pipe and fittings)
Pendleton Flats with 4Sight Construction
- 30-unit apartment complex across three buildings in Kansas City, MO
- Remodel of existing buildings
- Saw cut & excavated to install new trunk lines for the sanitary system & water service
- Installed a pump in each building
- Materials were PEX for water piping above grade
- Materials were uponor PEX for water piping below grade
- Materials were PVC for below grade drain, waste, and vent
- Cast iron for condensate piping (no hub cast iron pipe and fittings)
- Installed new area drains for the patios
- New inline traps to serve the area drains
Maple Terrace with 4Sight Construction
- 72 units of student housing near KCUMB
- Materials used were CPVC water mains, PEX unit distribution, and PVC for sanitary
Brittany Court Clubhouse with 4Sight Construction
- New construction in Gardner, KS