The Edge at Olathe with Straub Construction
- 22 unit apartment complex in Olathe, KS
- Units with 2 bedroom, 1 bathroom, and a kitchen
- Rebuild of previously burned down building
- Saw cut and replacement of existing underground
- Materials were PVC for drain, waste, and vent
- PEX & Polymer fittings for unit distribtion
- CPVC fittings for water mains
- Installed fire service line & FDC line (ductile iron)
- Installed a new water meter & water service to the building (type K copper pipe and fittings)